|
Klondex holds a 66.66% interest in 48 claims in the Schroeder Mountain quadrangle. The property is on three separate sections miles located about three miles northeast of Newmont's Gold Quarry mine and 1.5 miles east of the old Queen Anne mine in the heart of the Carlin Trend. The mine and mill complex at Gold Quarry was built at an estimated cost of U.S. $200,000,000, and is considered to be Newmont's crowning financial and mining achievement. Gold Quarry produced 1.6 million ounces of gold in 1996. Numerous small pits can be found throughout the property which have been dug on mineralized surface outcrops. (Updated June 2009)
|